
Table of Contents
1.
Note to the User .................................................................................. 1
1.1
Introduction .................................................................................................................................. 1
1.2
Handling of Secondary Batteries for the Absolute Specification.................................................. 1
1.3
Safety Precautions ....................................................................................................................... 2
1.4
Warranty Period and Scope of Warranty ..................................................................................... 3
2.
Specifications ...................................................................................... 4
2.1
Basic Specifications ..................................................................................................................... 4
2.1.1
Backup Batteries for the Absolute Specification .................................................................... 5
2.2
Name and Function of Each Part of the Controller ...................................................................... 6
2.2.1
Names.................................................................................................................................... 6
2.2.2
Functions................................................................................................................................ 6
2.3
External Dimensions .................................................................................................................... 8
2.3.1
Standard Specification .......................................................................................................... 8
2.3.2
Absolute Specification with Battery Bracket........................................................................... 9
Absolute Specification without Battery Bracket .............................................................................. 10
3.
Installation and Noise Elimination ..................................................... 11
3.1
Installation Environment..............................................................................................................11
3.2
Power Supply ..............................................................................................................................11
3.3
Noise Elimination and Grounding ...............................................................................................11
3.4
Heat Radiation and Installation .................................................................................................. 13
4.
Wiring ................................................................................................ 14
4.1
Internal Drive-Power Cutoff Relay Type..................................................................................... 14
4.1.1
Configuration........................................................................................................................ 14
4.1.2
External Connection Diagram.............................................................................................. 15
4.1.3
Wiring the Power Supply/Emergency-Stop Switch .............................................................. 16
4.2
External Drive-Power Cutoff Relay Type.................................................................................... 23
4.2.1
Configuration........................................................................................................................ 23
4.2.2
External Connection Diagram.............................................................................................. 24
4.2.3
Wiring the Power Supply/Motor Power Cutoff Relay ........................................................... 25
4.3
Connecting the I/O Cables......................................................................................................... 27
z
PIO pattern 0 [Conventional] ...................................................................................................... 27
z
PIO pattern 1 [Standard]............................................................................................................. 28
z
PIO pattern 2 [64-point positioning]............................................................................................ 29
z
PIO pattern 3 [2 zone output signals] ......................................................................................... 30
z
PIO pattern 4 [Teaching]............................................................................................................. 31
4.4
Connecting the Actuator............................................................................................................. 32
4.5
Connecting the Communication Cable ...................................................................................... 35