4
Step 3
Step 1
Step 2
QV-All American Series Instrument Shelves
Place Instrument Shelf work surface top side down on smooth flat surface being sure to protect it from
damage by foreign objects. IAC recommends the use of packing type blankets or clean cardboard.
Step 1:
Place the instrument shelf upside down on smooth flat surface being sure to protect it from damage
by foreign objects. IAC recommends the use of packing type blankets or clean cardboard. Place the riser
boxes onto the instrument shelf aligning the slots in the riser boxes with the holes on the instrument shelf.
Then screw in the Bolts, #14A X .75 SMS HWD BLK provided and Washer, ¼ Flat Fender Black into the
holes of the riser box and instrument shelf and hand tighten. DO NOT TIGHTEN THIS HARDWARE.
Step 2
: Connect the support beam
to the riser boxes using the Screws, ¼-
20 X .500 PPH “F” Black and
Washer ¼ Flat Black provided. Align support beam-ends with holes in riser boxes and feed screws through
the support beam-ends plate and the holes in the riser boxes and hand tighten.
Note:
The next step requires the drilling of holes onto the work surface in order to mount your instrument
shelf assembly. See page 6 for a diagram on where to place the holes.
Step 3:
Align the holes on the bottom of riser boxes with the inserts on top of the work surface. Attach the
riser boxes with the Bolts, #14A X .75 SMS HWD BLK and Washer, ¼ Flat Fender Black as shown. Tighten
hardware at this time being careful not to over tighten the hardware going into the holes in the work surface.
Make sure all hardware is tightened and secure.