Operation
‐
Initial
Startup
26
Table
7:
Recommended
Compressor
Warm
‐
up
Time
Disconnect
off
Time
Compressor
Warm
‐
up
Time
<
30
min
0
min
30
min
to
2
hrs
2
hrs
2
hrs
to
4
hrs
4
hrs
>
4
hrs
8
hrs
CAUTION
Starting
the
chiller
pre
‐
maturely
without
allowing
adequate
time
for
the
compressors
to
warm
‐
up
can
allow
the
liquid
refrigerant
to
be
pumped
through
the
compressor
lubrication
system
and
cause
permanent
damage
to
the
compressor
bearings
and
void
the
chiller
warranty.
7.2
Initial
Startup
7.2.1
Local
Mode
Start
‐
up
The
chiller
can
be
operated
in
a
Local
Mode
where
it
operates
independent
of
the
plasma
cutting
system,
or
in
a
Remote
Mode
where
it
starts
and
stops
automatically
based
on
the
state
of
the
Remote
Start/Stop
interlock
from
the
plasma
cutting
system.
Upon
initial
startup
the
chiller
should
be
started
in
Local
Mode
to
checkout
chiller
operation
independent
of
the
plasma
cutting
system.
7.2.1.1
Starting the Chiller in Local Mode
To
start
the
chiller
turn
the
Local/Off/Remote
Switch
below
the
controller
to
the
position.
The
pumps
will
turn
on
and
start
circulating
water.
7.2.1.2
Leak Check
Thoroughly
check
all
the
plumbing
hoses
and
fittings
between
the
chiller
and
plasma
cutting
system
to
ensure
no
leaks
are
present.
Remove
the
filter
panel
from
the
side
of
the
chiller
and
inspect
the
internal
chiller
plumbing
to
ensure
there
are
no
internal
plumbing
leaks.
Replace
the
filter
panel.
If
any
leaks
are
found
turn
the
Local/Off/Remote
Switch
to
the
“O”
position
and
wait
for
the
pumps
to
automatically
shut
off
(The
process
pump
shuts
down
in
~3s
and
the
recirculation
pump
in
~10s).
Once
any
leaks
have
been
repaired
restart
the
procedure
at
7.2.1
Local
Mode
Start
‐
up.
7.2.1.3
Process Pump Check
From
the
chiller
controller
home
screen
press
and/or
to
highlight
the
MONITORING
selection.
Press
to
access
the
MONITORING
menu
and
press
until
the
“Process
Fluid
Circuit”
monitoring
screen
appears.
Check
the
process
pump
“Flow
Rate”
to
make
sure
it
exceeds
1.3gpm
(4.92lpm)
at
50Hz
or
2.2gpm
(8.33lpm)
at
60Hz.
Also
check
the
process
fluid
circuit
discharge
pressure
(“Dis
Press”)
to
ensure
it
is
at
least
10psi
(68.9kPa)
below
the
shutdown
pressure
of
240psi
(1,655kPa).
The
process
pump
circuit
is
equipped
with
a
pressure
relief
bypass
valve
that
is
set
to
start
opening
at
190psi
(1,310kPa)
and
fully
bypass
the
flow
at
230psi
(1,586kPa).
Hypertherm, Inc. Part Number: 810540
Summary of Contents for Koolant Koolers N-Series
Page 61: ...Appendix B Electrical Schematics PLC 59 PLC Hypertherm Inc Part Number 810540...
Page 62: ...Appendix B Electrical Schematics I O Module 60 I O Module Hypertherm Inc Part Number 810540...
Page 63: ...Appendix B Electrical Schematics Logic 61 Logic Hypertherm Inc Part Number 810540...
Page 73: ...Appendix E Declaration of Conformity 71 Hypertherm Inc Part Number 810540...
Page 74: ...Appendix E Declaration of Conformity 72 Hypertherm Inc Part Number 810540...
Page 75: ...Appendix E Declaration of Conformity 73 Hypertherm Inc Part Number 810540...