16 Assignment_main_relay
The relay is energised if ...
0
Collective_fault
There is any kind of error
1 Safety_interlock_open
The interlock (safety) system [11] is open
2 No_Demand
No demand [5] is present
3 Humidification
Steam production is in progress
4 Runtime_limitation
The unit has switched off steam production after the limitation of operating time was
reached [32]
5 Remote_off
A remote shutdown was carried out via software command [12]
6 Safety_interlock_ELV
The interlock (safety) system [11] is switched via an additional relay
7 Safety_interlock_closed
The interlock (safety) system [11] is switched as standard
8 Humdification_off_delay
A dropout delay [74] is to be generated following humidification
30 Soleniod_valves_off
None of the solenoid valves are actuated
31 Soleniod_valves_on
One of the solenoid valves is actuated
32 Soleniod_valve 1
Solenoid valve 1 is actuated
33 Soleniod_valve 2
Solenoid valve 2 is actuated
36 HyFlush
The superflush SV is switched via the contacts of this relay
60 Pump_off
The blow-down pump is not actuated
61 Pump_on
The blow-down pump is actuated
62 Part._blow-down
A partial blow-down [21] is taking place
63 Full_blow-down
A full blow-down [22] is taking place
64 Dilution
A dilution [23] is taking place (only for ELDB [77])
65 Max._current_blow-down
An overcurrent blow-down [24] is taking place (only for ELDB [77])
66 Max._level_blow-down
A max. level blow-down [25] is taking place (only for HKDB [78])
67 Standby_blow-down
A standby blow-down [26] is taking place
68 Dead_leg_flushing
An additionally installed relay is to be actuated, which switches the input solenoid valve for
flushing the dead-end line if the interlock (safety) system is not closed
69 Start_blow-down
A start blow-down [20] is taking place
120 Cylinder_1_step_1
Power level [63] 1 of cylinder 1 is active (only for HKDB [78])
121 Cylinder_1_step_2
Power level [63] 2 of cylinder 1 is active (only for HKDB [78])
122 Cylinder_2_step_1
Power level [63] 1 of cylinder 2 is active (only for HKDB double cylinder units)
123 Cylinder_2_step_2
Power level [63] 2 of cylinder 2 is active (only for HKDB double cylinder units)
240 Light 1
Light 1 is to be switched directly
241 Light 2
Light 2 is to be switched directly
242 Light 3
Light 3 is to be switched directly
243 Light 4
Light 4 is to be switched directly
244 Exhauts_fan 1
Steam bath fan 1 is active
245 Exhaust_fan 2
Steam bath fan 2 is active
246 Supply_fan 1
Steam bath fan 3 is active
247 Supply_fan 2
Steam bath fan 4 is active
248 Essence 1
Essence pump 1 is active
249 Essence 2
Essence pump 2 is active
250 Essence 3
Essence pump 3 is active
251 Essence 4
Essence pump 4 is active
252 ECO_active
Steam bath target temperature is switched to ECO mode [61]
253 Steam_boost_active
A steam jet [60] is triggered
254 Steam_boost_blocked
A further steam jet is blocked
[60]
255 Temp._threshold
The preset temperature threshold value [88] has been reached
270 Collective_service
A general service message is generated
271 Service_solenoid_valve
A service for one of the solenoid valves is required
272 Service_blow-down_pump
A service for the blow-down pump is required
273 Service_steam_amount_cnt.
A service is required after the steam volume counter which is relevant for the service was
reached
274 Service_main_contactor K1
A service is required after the max. operating cycles for K1 have been reached
Adjustment/value range
Factory presets (FP)
bold
275 Service_main_contactor K2
A service is required after the max. operating cycles for K2 have been reached (only for
double cylinder units)
276 Service_main_contactor K3
A service is required after the max. operating cycles for K3 have been reached (only for
double cylinder units)
277 Service_main_contactor K4
A service is required after the max. operating cycles for K4 have been reached (only for
double cylinder units)
278 Service_main_contactor K5
A service is required after the max. operating cycles for K5 have been reached (only for
double cylinder units)
17 Assignment_relay 1
see above
Relay 1 is one of the top-hat rail relays connected to the ST10.1 connector on the
mainboard; assignment is same as for base relay
18 Assignment_relay 2
see above
Relay 2 is the second of the top-hat rail relays connected to the ST10.1 connector on the
mainboard; assignment is same as for base relay
19 Assignment_relay 3
see above
Relay 3 is one of the top-hat rail relays connected to the ST10.2 connector on the
mainboard; assignment is same as for base relay
20 Assignment_relay 4
see above
Relay 4 is the second of the top-hat rail relays connected to the ST10.2 connector on the
mainboard; assignment is same as for base relay
*) when this is the ex factory setting, no other assignment is possible for the base relay