Hand-over Procedures
The entire system shall be thoroughly inspected to make
sure that it is complete and that all tests required during
installation have been properly carried out�� In addition, the
following items are particularly important��
1�� A container should be refilled or replaced when it
shows a loss in agent quantity of more than 5% or a
loss in pressure (adjusted for temperature) of more
than 10%�� (Operating pressure of unit at 25 bar at
21 °C, 360 psi at 70 °F)�� Refer to Appendix A for
pressures at other container temperatures��
2�� Check container weight information label against
system requirement�� If there is any doubt or if there
has been a loss of weight, then the container must be
weighed��
3�� Make sure the system is armed and the actuating
systems are operational��
Ensure adequate escape routes with directional signs
are provided�� Issue of the appropriate documentation shall
constitute completion of the Hand-over procedure��
Appropriate records shall be issued by fire and/or
insurance authorities as to the suitability, acceptability and
availability of the system for the hazard area��