P a g e
5 | 38
NOTE!
A Hydrotec technician will make all
connections between the control box
and reactor and supply UV lamps when
the system is commissioned. If the unit
is to be connected to a BMS panel, this
is the responsibility of the BMS
installation technician. Connections to
BMS can be found within this manual in
the wiring diagram.
The control box is to be mounted within
the reach of cables the unit was
provided with! Under no circumstances
it is allowed to modify the cables in any
way!
Summary of Contents for HYDROWELL Compact 10E
Page 16: ...P a g e 16 38 Reactor Dimensional drawing with parameters from technical data sheet...
Page 18: ...P a g e 18 38 Control Box Power switch ON OFF UV monitor Cable fittings...
Page 30: ...P a g e 30 38 Appendices 1 Installation Schematic UV Disinfection System...
Page 31: ...P a g e 31 38 Appendices 2 Wiring diagram HydroWELL 2 E 5 E and 10 E with sensor...