Start-up after maintenance and repair work
-
Check screw connections for tight fit
-
Ensure that any components removed beforehand are installed and restored to their correct
operational position
-
It is to be ensured that all materials, tools and other appliances which were necessary for
maintenance and repair work are removed from the working area of the system
-
Any liquid that has leaked is to be removed
-
Ensure that all safety equipment is in a perfectly serviceable condition
Regulations in respect of environmental protection
When working on and with the system, all legal regulations in respect of waste minimisation and
proper disposal (if appropriate) must be observed and respected.
The elements listed below in particular must not be allowed to contaminate the soil or enter the
drainage system during installation, maintenance and repair work:
-
Grease and lubrication oils
-
Hydraulic oils
-
Cooling agents
-
Acids and alkalis (bases)
-
Disinfection agents
Such substances must be stored, transported and collected in suitable tanks and
disposed of in accordance with the applicable regulations!
Summary of Contents for HYDROWELL Compact 10E
Page 16: ...P a g e 16 38 Reactor Dimensional drawing with parameters from technical data sheet...
Page 18: ...P a g e 18 38 Control Box Power switch ON OFF UV monitor Cable fittings...
Page 30: ...P a g e 30 38 Appendices 1 Installation Schematic UV Disinfection System...
Page 31: ...P a g e 31 38 Appendices 2 Wiring diagram HydroWELL 2 E 5 E and 10 E with sensor...