26
Rev. 04022020
STEP 12: TIE
-
OFF MOORING (MOORING ROPES NOT INCLUDED)
Single
-
Sided Tie Off (Optional)
1.
Attach Side
-
Tie bumper pipe to the Side
-
Tie Bumper Bracket us-
ing the supplied U
-
Bolt and Mounting Plate.
2.
Replace the end spacer tubes with the Side
-
Tie Bumper.
3.
Replace the spacers on the end tanks with the Side
-
Tie Bumper.
4.
Attach the walkway support. For more information, refer to
STEP
8:
TANK AND WALKWAY ALIGNMENT/ATTACHMENT.
Tie off the lift using a method similar to mooring a boat in a slip. The goal is to restrain the lift as much as
possible while leaving enough slack in the lines to allow the lift to raise and lower properly.
NOTE: Use a good mooring rope with enough strength for the size of boat and lift being installed. Use a
minimum rope diameter of
3/8”
for boats up to
25’, 1/2”
for boats up to
35’,
and
5/8”
for boats up to
45’.
There are several variables involved in rope selection and tie
-
off locations, so check the mooring regularly for any
changes in rope condition, tie
-
off points, etc.
Be sure that all tie
-
off points are in good condition and structurally sound enough to handle the load the mooring will
apply. We recommend Double Braid Nylon Dock lines.
Parts Required
Hardware Required
Side
-
Tie Bumper (not supplied)
U
-
Bolt with Mounting Plate
Side
-
Tie Bumper Pipe (not supplied)
Mounting Plate
Bumper Pipe
Side
-
Tie Bumper