16
Rev. 04022020
STEP 6(c): INSTALL TANK CROSS BEAM ASSEMBLY
Part #
Parts Required (Per Tank)
HH
-
LPL
-
1026
BEAM STRAP—ALUMINUM –HARBORHOIST
HH
-
LPL
-
1018*
CROSS CHANNEL
-
I BEAM 84 inch
Part #
Hardware Required (Per Tank)
HH
-
1975
BRASS HEX NUT 3/8
-
16
2090242
FLAT WASHER
3/8”
SS
HH
-
LPL
-
1505
LOCK WASHER 3/8
-
16 SS
HH
-
LPL
-
1508
WASHER
-
FLAT
-
1/2" x 2 OC SS
1.
Connect the facing tanks by placing the Cross Channels on top of the Support Channels between the U
-
Bolts. Install the Beam Strap to the tank frame assemblies.
2.
Finger
-
tighten the U
-
Bolt nuts to hold the Beam Strap in place. Repeat for each set of tanks.
Do not fully tighten until you verify that Step 6(a), 6(b), and 6(c) have been completed.
THE CROSS CHANNEL END SHOULD HAVE AT LEAST 2 INCHES OF CHANNEL VISIBLE BEFORE GOING UNDER
THE BEAM STRAP
Support Channel
Beam Strap
3/8
-
16 Brass Hex Nut
3/8”
SS Flat Washer
3/8”
SS Lock Washer
I Beam Cross Channel *
End of Cross Channel
(2”
visible minimum)
Use Kit Box: #HH
-
2650
* Part# will depend on model of lift.
Summary of Contents for HarborHoist HH-4400
Page 1: ...1 Rev 04082020 ...
Page 35: ...35 Rev 04082020 Appendix ...
Page 38: ...38 Rev 04022020 ...