30
Rev. 04022020
1.
The Top Plate and Gasket are pre
-
drilled for the bolt assembly. In some early models, you may have to
field drill them. Contact customer service for instructions in this case.
2.
Place the Mooring Cable around the Mooring Pole assembly and bolt, as illustrated below.
3.
Tighten the assembly, verifying the bolt is unable to rotate or move. The cable loop at both ends should be
free to move with the bolted assembly.
STEP 14: CABLE MOORING ASSEMBLY INSTALLATION—Optional Kit
Part#: MOR
-
00
-
0001
It is highly recommended that you use a double braid nylon dock line at each mooring location to secure
the hoist to the dock in case of a mooring failure. The eyelet on the top plate is supplied for this reason.
Verify it has slack and cannot catch anything while raising or lowering the hoist or during tide activity.
Mooring Cable
Bolt 1/2"
-
13 UNC
-
SS
Sleeve Bearing
Washer Flat
-
2" O.D.
Nut 1/2"
-
13 UNC
-
SS
Top Plate
Summary of Contents for HarborHoist HH-4400
Page 1: ...1 Rev 04082020 ...
Page 35: ...35 Rev 04082020 Appendix ...
Page 38: ...38 Rev 04022020 ...