33
Installation checklist
Before you leave site, review the following items to be sure that the
installation is going to be a good one.
□
Have you calibrated and zeroed your pressure transducer?
□
Have you run an instantaneous value to confirm data quality?
□
Have you run the IDT and set all calibration factors?
□
Have you run a GPRS test to confirm communications quality?
□
Have you confirmed the GPRS message was received by DataGate™?
□
Have you sealed any joins in the pulser cable?
□
Have you confirmed an SMS message with the chamber lid closed?
□
Have you recorded all your site information, serial nos, photos, etc?
□
Have you closed all open chambers and recorded any damage?
□
Have you left all wiring tidy and safe
– not tied to ladders?
□
Have you removed all your installation tools?
□
Have you recorded the GPS location of the logger?
You have now completed your site installation and confirmed that the logger is
operating and transmitting its data to DataGate™ (or your local data server).
The
next section deals with how to use DataGate™ and HWMOnline™.
Summary of Contents for Multilog LX 2
Page 48: ...47 ...