wc_tx002045gb.fm
42
Operation
CRT 48-33K
4.11
Breaking In New Machines
Verify pitch
link assembly
Verify that the horizontal blade pitch links are properly assembled.
While seated on the machine, look at the right rotor. There should be an “R”
designation on the upper portion of the pitch link. The left rotor should have an “L”
on the pitch link.
Break in
gearboxes
To break in the gearboxes, run the engine at 50% of full throttle for the first 2–4
hours. This will prevent premature wear and extend gear life.
NOTICE:
Running the engine at full throttle during the break-in period could result
in premature gear failure.
wc_gr009773
L
L
R
R
"L"
"R"
Summary of Contents for CRT48-33K
Page 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes ...
Page 8: ......
Page 12: ...Table of Contents CRT 48 33K wc_bo5200004710_09TOC fm 12 ...
Page 32: ...Lifting and Transporting CRT 48 33K 32 wc_tx003110gb fm Notes ...
Page 36: ...wc_tx002045gb fm 36 Operation CRT 48 33K 4 6 Control Component Locations wc_gr010112 o n m l ...
Page 101: ...33 Notes 34 Notes ...
Page 103: ...CRT 48 33K Schematics wc_tx002048gb fm 103 10 Schematics ...
Page 106: ......