![Husqvarna CRT48-33K Operator'S Manual Download Page 33](http://html.mh-extra.com/html/husqvarna/crt48-33k/crt48-33k_operators-manual_173495033.webp)
wc_tx002045gb.fm
33
CRT 48-33K
Operation
4
Operation
4.1
Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine. Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
4.2
Break-in Period
Overview
New engines require a break-in period to ensure maximum efficiency. During the
break-in period, the internal components of the engine wear slightly and develop a
tight seal.
The engine in this machine has a 50 hour break-in period.
Operating
during the
break-in
period
Follow the recommendations below while operating the machine during the break-
in period.
Allow the engine to warm up completely before operating the machine in cold
weather.
Change the engine oil and oil filter after 50 hours of operation. See topic
Engine
Oil and Filter
in the “Maintenance” chapter.
Summary of Contents for CRT48-33K
Page 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes ...
Page 8: ......
Page 12: ...Table of Contents CRT 48 33K wc_bo5200004710_09TOC fm 12 ...
Page 32: ...Lifting and Transporting CRT 48 33K 32 wc_tx003110gb fm Notes ...
Page 36: ...wc_tx002045gb fm 36 Operation CRT 48 33K 4 6 Control Component Locations wc_gr010112 o n m l ...
Page 101: ...33 Notes 34 Notes ...
Page 103: ...CRT 48 33K Schematics wc_tx002048gb fm 103 10 Schematics ...
Page 106: ......