204
PRE -DELIVERY INSPECTION
Description
Operation
Pre-delivery
Description
Operation
Pre-delivery
: only for motorcycles with 2 stroke engine
: only for some models
Engine oil
Check level
Two-stroke mix oil level
Check level
Coolant
Check / Restore level
Cooling system
Check for leakage
Electric fans
Check operation
Spark plugs
Check / Replace
Throttle body / Carburettor
Check and adjust
Brakes / Clutch fluid
Check level
Brakes / Clutch
Check operation
Brakes / Clutch
Check lines for leakage
Throttle control
Check operation
Throttle control
Check / Adjust play
Choke control
Check operation
Flexible controls and transm. Check / Adjust
Drive chain
Check / Adjust
Tyres
Check pressure
Side stand
Check operation
Side stand switch
Check operation
Electrical equipment
Check operation
Instrument panel
Check operation
Lights / Visual signals
Check operation
Horn
Check operation
Headlight
Check operation
Ignition switch
Check operation
Locks
Check operation
Screws and nuts
Check / Tighten
Hose clamps
Check / Tighten
General lubrication
General test
IMP. 11-250-300-2009 16-06-2008 12:00 Pagina 204
Summary of Contents for 2009 WR 250
Page 181: ...181 USA CDN B 3 4 5 1 C F D E 2 6 A G IMP 10 250 300 2009 16 06 2008 11 47 Pagina 181 ...
Page 198: ...198 NOTES FOR USA CDN MODEL IMP 11 250 300 2009 16 06 2008 12 00 Pagina 198 ...
Page 236: ...MEMORANDUM 236 IMP 13 250 300 2009 13 06 2008 11 26 Pagina 236 ...
Page 237: ...237 MEMORANDUM IMP 13 250 300 2009 13 06 2008 11 26 Pagina 237 ...
Page 238: ...MEMORANDUM 238 IMP 13 250 300 2009 13 06 2008 11 26 Pagina 238 ...
Page 239: ...239 MEMORANDUM IMP 13 250 300 2009 13 06 2008 11 26 Pagina 239 ...
Page 240: ...240 MEMORANDUM IMP 13 250 300 2009 13 06 2008 11 26 Pagina 240 ...
Page 241: ...241 MEMORANDUM IMP 13 250 300 2009 13 06 2008 11 26 Pagina 241 ...
Page 242: ...242 MEMORANDUM IMP 13 250 300 2009 13 06 2008 11 26 Pagina 242 ...