ViewPoint 8650C
User Guide
2 Installation Guide
Issue 10 (2013-07-20)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
19
2
Installation Guide
About This Chapter
The MCU can be placed on an even surface or fixed on a customized cabinet.
2.1 Before Installation
Before installation, you need to prepare tools as required and check the equipment room.
2.1.1 Preparing Tools and Meters
The tools mentioned are not provided with the MCU. You need to make sure that these tools are
available.
Common tools and dedicated tools are both required in the engineering process.
List of Universal Tools
Tools for marking lines
Tap, ruler (1 meter), marker, and scriber.
Tools for drilling holes in concrete
Hydraulic pressure percussion drill, percussion (Ф6 Ф8 Ф10 Ф12 Ф1
Ф16) v m
Tools for fastening bolts and screws
−
Flathead screwdriver (M3 - M6)
−
Cross screwdriver (M3 - M6)
−
Adjustable wrench
−
Socket wrench (M6, M8, M12, M14, M17, and M19)
−
Ring spanner (M6, M8, M12, M14, M17, and M19)
Tools for making cables
RJ-45 crimping pliers
Tools for measuring length
Industrial horizontal ruler, tap measure, ruler, and angle square