UPS5000-S-1200 kVA
User Manual
3 Installation
Issue 04 (2019-06-25)
Copyright © Huawei Technologies Co., Ltd.
55
Figure 3-14
Installing connecting plates
Step 5
Use M12x60 expansion bolts to secure the power units, bypass unit, and input/output unit to
the expansion bolt mounting holes on the floor in sequence.
Step 6
Install anchor baffle plates.
Figure 3-15
Installing anchor baffle plates
----End
3.2.1.2 Channel Steel Installation
Prerequisites