UPS5000-A-400 kVA
User Manual (50 kVA, PF=0.9)
3 Installation
Issue 03 (2020-01-10)
Copyright © Huawei Technologies Co., Ltd.
39
Figure 3-2
Reserved clearances (unit: mm)
3.1.2 Tools and Instruments
Insulate installation tools to prevent electric shocks.
Prepare the following tools and meters indicated in
Table 3-2
Tools and meters
Tools and Meters
Electric pallet truck
Manual pallet truck
Ladder
Rubber mallet
Hammer drill and
drill bit Φ16
Hand-held electric
drill
Alloy hole saw
Heat gun