Step 4
Use eight M12x45 bolts to secure the cabinet to the mounting holes in the channel steel and
tighten the bolts.
Step 5
Install the front and rear anchor baffle plates and left and right anchor baffle plates, as shown
in
Step 6
(Recommended) Install a lock for the maintenance bypass switch to prevent misoperations, as
shown in
. The required lock core diameter is 5–10 mm.
----End
3.2.2 Installing Batteries
Context
Before installing batteries, read through the battery safety precautions, obtain the delivered
battery installation guide, and install batteries as instructed.
Place the batteries in a correct way to prevent vibrations and shocks.
Install the batteries from the lower layer to the upper layer to prevent falling over due to
imbalance.
Procedure
Step 1
Install a battery rack and batteries.
For details, see the battery installation guide delivered along with batteries.
----End
3.2.3 Installing Optional Components
3.2.3.1 Installing Antiseismic Kits
Install antiseismic kits only when the cabinet is floor-mounted.
Step 1
Determine the positions for installing the antiseismic kits. Mark mounting holes based on the
drawings.
shows the hole dimensions.