Figure 3-61
Connecting signal cables to a dual-bus system
Connecting Other Signal Cables
Connect other signal cables to each UPS.
3.4 Installation Verification
If the check results of listed items 10 and 11 in
do not meet the acceptance criteria,
the UPS may be damaged.
Table 3-8
Installation checklist
No.
Item
Acceptance Criteria
01
Consistency between system
configurations and delivery
The system models comply with the
contract.