Step 9 Connect the cable of the supercapacitor to the RAID controller card. See
.
Figure 5-70 Connecting the supercapacitor cable
Step 10 Install the chassis cover. For details, see
Step 11 Install the server. For details, see
5.4.3 Installing the Server on Guide Rails
Step 12 Connect the power cables. For details, see
Step 13 Power on the server. For details, see
.
Step 14 Log in to the iBMC WebUI, and check whether the new component is normal. For
TaiShan Rack Server iBMC User Guide
----End
5.16 DIMM
Removing a DIMM
Step 1 Wear an ESD wrist strap. For details, see
.
Step 2 Power off the server. For details, see
.
Step 3 Remove the power cables. For details, see
Step 4 Remove the server. For details, see
5.4.4 Removing the Server and Guide Rails
.
Step 5 Remove the chassis cover. For details, see
Step 6 Remove the air duct. For details, see
.
Step 7 Simultaneously press the ejectors outwards. See (1) in
TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
5 Removal and Installation
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
132