Figure 5-43 Removing the upper tray of riser module 3
Figure 5-44 Removing the lower tray of riser module 3
Step 8 Remove all PCIe cards from the riser module. For details, see
.
Step 9 Place the removed riser module in ESD bags.
TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
5 Removal and Installation
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
112