![Huawei FusionServer Pro G5500 Routine Maintenance Download Page 85](http://html.mh-extra.com/html/huawei/fusionserver-pro-g5500/fusionserver-pro-g5500_routine-maintenance_169693085.webp)
Page 85
Copyright © Huawei Technologies Co., Ltd. 2020
Installing a heat sink
1.
Align the heat sink with the GPU, and slowly place the heat sink above the GPU.
2.
Tighten the four screws on the left and right sides of the heat sink in a diagonal sequence
using a torque screwdriver. See (1) in the figure.
Notice: The torque for installing a heat sink screw is 0.4 N·m. If the torque exceeds 0.4
N·m, the GPU screw thread slips.
Installing a GPU Card in the GS608