FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
A A Basic Installation Operations
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
94
Material: label
Documents: none
Skill requirement: common technician
Procedure
Step 1
(Optional) Prepare labels based on site requirements.
Label information must be clear and specific.
Labels must be easy to attach and can be securely attached.
Labels must be resistant to corrosion and deterioration.
Step 2
Select correct cable labels.
Step 3
Remove the simple labels attached to a cable during layout and attach the selected labels to
both ends of the cable.
Labels must be securely attached.
Labels must be attached in eye-catching positions on cables for ease of maintenance.
The labels on both ends of a cable must be the same.
----End
A.2 Preparing Cable Terminals
Preparations
Tools: hydraulic pliers, heat gun, and crimping tool
Materials: heat shrink tubing, DT terminal, OT terminal, and cord end terminal
Documents: none
Skill requirement: common technician
Procedure
Step 1