Step 3
Remove the cover lock nut, guarding, and ferrule from the DPJ end connector using the feeder
window wrench shipped with pre-fab. modules.
Step 4
Place the cover lock nut and guarding along a cable into the plastic-coated metal hose, as
shown in
Figure A-7
Connecting the hose to the DPJ end connector
Step 5
Screw the ferrule into the plastic-coated metal hose, as shown in
Figure A-8
Installing a DPJ end connector
Step 6
Route the cable into the pre-fab. module through the body of the DPJ end connector.
People inside and outside the pre-fab. module should work together to route the cable to
the specified connection position inside the pre-fab. module.
To facilitate operation during internal routing, you can remove some top plate in the
pre-fab. module aisle.
Step 7
Connect the ferrule to the body and tighten the cover lock nut using the dedicated feeder
window wrench.
Step 8
Apply sealant on the joint between the DPJ end connector and the sheet metal on the pre-fab.
module, as shown in