FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
6 Installing Devices Inside the Pre-fab. Module
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
55
----End
Follow-up Procedure
Verify the battery cable connections. Ensure that the battery quantity and cable connections
comply with the design and the cables or copper bars are reliably installed. Connect the
battery short-circuit copper bar and reinstall the insulation cover.
6.3 (Optional) Installing the Electric Heating Belt
Prerequisites
The pre-fab. modules have been installed.
Preparations
Tools: None
Materials: low-temperature component suite
Skill requirements: cooling engineer, common technician
Procedure
Step 1
Wrap the electric heating belt around the drainpipe and water refill pipe outside the pre-fab.
module.
Figure 6-21
Wrap the electric heating belt around the drainpipe and water refill pipe
Step 2
Secure the temperature probe to the pipe using a cable tie.