FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
9 Installation Verification
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
81
No. Check Item
Check
Method
Expected Result
Cabinets are clean and have no dust,
excessive cable ties, cable cuts, or other
foreign matter inside.
7
Cable binding
Observe
Cables are neat and not coiled, and
excessive parts are cut.
Cable ties do not overlap, and the joints
are evenly cut without burrs.
Cables are placed properly and not tense
at turning points.
Cable routes are straight and smooth,
and do not intersect inside a cabinet.
8
Installation of
external accessories
Observe
The number and positions of external
accessories installed conform to design
requirements.
9
Labels
Observe
All labels are correct, clear, and complete.