a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the chassis.
3.
Disconnect all peripheral cables from the servers and chassis.
4.
Remove the chassis from the rack.
5.
6.
Remove the PDB cover.
CAUTION: The latches on the energy pack holder are flexible. However, to avoid damaging the holder, do not apply
too much pressure on these latches when installing or removing the energy pack from the chassis.
7.
If installed, removed the energy pack holder.
Hardware options installation
78