Installing and Configuring the Director
50
Director 2/64 Installation Guide
Figure 12: Securing the two mounting brackets
3. Using a torque driver, torque the screws to 22 in/lb.
4. Locate the two (2) rear mounting plates in the shipping carton.
5. Secure the two (2) rear mounting plates to each side of the switch, as shown in
. For each plate, use the two (2) flathead countersunk Phillips screws
(10-32 x 0.25 in) provided.
6. Using a torque driver, torque the screws to 22 in/lb.
Insert the Cage Nuts
Read the following sections for instructions on inserting front and rear cage nuts
in the rack.
Insert the Front Cage Nuts in the Rack
Use these steps to insert the six supplied cage nuts in the rack’s front rails:
1. Select one of the front rails.
2. Count up eleven (11) square openings from the top screw of the shelf bracket,
and insert the first of three (3) cage nuts.