
Installation and Configuration
16
1/16 Tape SuperLoader Reference Guide
6. Attach one U-channel bracket to each rear rail of the rack, loosely installing
the screws through the clipnuts. (Attach the side of the bracket with only two
holes.) Do not tighten the screws yet.
Figure 9: Attaching the U-channel brackets to the rack
7. Position the SuperLoader in the rack so that each support bracket rests on a
U-channel bracket. Each support bracket slides along the lip of the U-channel
bracket.
Figure 10: Positioning the SuperLoader in the rack
Summary of Contents for StorageWorks 1/16 Tape SuperLoader
Page 8: ...Contents viii 1 16 Tape SuperLoader Reference Guide ...
Page 14: ...About this Guide xiv 1 16 Tape SuperLoader Reference Guide ...
Page 22: ...Overview 8 1 16 Tape SuperLoader Reference Guide ...
Page 56: ...Installation and Configuration 42 1 16 Tape SuperLoader Reference Guide ...
Page 104: ...SuperLoader Operation 90 1 16 Tape SuperLoader Reference Guide ...
Page 112: ...Tape Drive Cleaning 98 1 16 Tape SuperLoader Reference Guide ...
Page 122: ...Troubleshooting 108 1 16 Tape SuperLoader Reference Guide ...
Page 128: ...Regulatory Compliance Notices 114 1 16 Tape SuperLoader Reference Guide ...
Page 134: ...Specifications 120 1 16 Tape SuperLoader Reference Guide ...
Page 146: ...Index 132 1 16 Tape SuperLoader Reference Guide ...