Hardware options installation 63
b.
Tighten the T-15 screw to secure the component.
9.
Align the PCI riser board with the corresponding connector on the system board, and then press
down the riser cage.
10.
Tighten the two screws to secure the assembly.
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server
unless all PCI slots have either an expansion slot cover or an expansion board installed.
11.
Install the access panel (on page
12.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack.
13.
Power up the server (on page
Full-height half-length riser option
Summary of Contents for ProLiant DL60 Gen9
Page 14: ...Component identification 14 Fan locations ...
Page 22: ...Operations 22 o Secondary PCI riser cage o PCI blank ...
Page 86: ...Cabling 86 FBWC module slot 1 cabling FBWC module slot 2 cabling ...
Page 87: ...Cabling 87 FBWC module slot 3 cabling Smart Storage battery cabling ...
Page 117: ...Support and other resources 117 ...
Page 118: ...Support and other resources 118 ...