Operations 16
1.
If the rear panel cables are not secured by a cable management arm, do the following:
a.
Power down the server (on page
).
b.
Disconnect all peripheral cables from the server.
c.
Disconnect each power cord from the server.
2.
Do one of the following:
o
In a server that uses thumbscrew rack ears, loosen the captive thumbscrews that secure the
server faceplate to the front of the rack, and then slide the server out of the rack.
o
In a server that uses quick-release latch rack ears:
i.
Open the latches on both sides of the server.
ii.
If necessary, use a T-25 Torx screwdriver to loosen the shipping screws.
iii.
Slide the server out of the rack.
3.
After performing the installation or maintenance procedure, slide the server back into the rack, and
then press the server firmly into the rack to secure it in place.
4.
Do one of the following:
o
In a server that uses thumbscrew rack ears, tighten the captive thumbscrews.
Summary of Contents for ProLiant DL60 Gen9
Page 14: ...Component identification 14 Fan locations ...
Page 22: ...Operations 22 o Secondary PCI riser cage o PCI blank ...
Page 86: ...Cabling 86 FBWC module slot 1 cabling FBWC module slot 2 cabling ...
Page 87: ...Cabling 87 FBWC module slot 3 cabling Smart Storage battery cabling ...
Page 117: ...Support and other resources 117 ...
Page 118: ...Support and other resources 118 ...