Removal and replacement procedures 43
7.
Loosen the thumbscrew.
8.
Remove the existing FlexibleLOM.
Pull the FlexibleLOM toward the front of the server while removing it, to avoid catching it on the rear
chassis.
To replace the component:
1.
Firmly seat the FlexibleLOM in the slot, and then tighten the thumbscrew.
2.
Install the PCIe riser cage ("
Remove the primary PCIe riser cage
on page
3.
Install the access panel ("
4.
Slide the server into the rack.
5.
Connect the LAN segment cables.
6.
Connect each power cord to the server.
7.
Connect each power cord to the power source.
8.
Power up the server.
Summary of Contents for ProLiant DL385p
Page 12: ...Customer self repair 12 ...
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...
Page 50: ...Removal and replacement procedures 50 o 8 or 16 SFF configuration o 8 LFF configuration ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 99: ...Acronyms and abbreviations 99 UID unit identification USB universal serial bus ...