Removal and replacement procedures 33
5.
Remove the PCIe riser blank.
To replace the component, reverse the removal procedure.
Remove the primary PCIe riser cage
CAUTION:
To prevent damage to the server or expansion boards, power down the server
and remove all AC power cords before removing or installing the PCIe riser cage.
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
4.
Remove the access panel ("
5.
Remove any installed full-length expansion boards ("
Summary of Contents for ProLiant DL385p
Page 12: ...Customer self repair 12 ...
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...
Page 50: ...Removal and replacement procedures 50 o 8 or 16 SFF configuration o 8 LFF configuration ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 99: ...Acronyms and abbreviations 99 UID unit identification USB universal serial bus ...