Removal and replacement procedures 54
3.
Extend ("
Extend the server from the rack
Remove the server from the rack
on page
) the server from the rack.
4.
Remove the access panel ("
5.
Disconnect any external cables that are connected to the expansion board.
6.
Disconnect any internal cables that are connected to the expansion board.
7.
If a full-length expansion board is installed in slot 1, release the full-length expansion board retainer,
and then remove the primary PCIe riser cage.
8.
If a full-length expansion board is installed in slot 4, release the full-length expansion board retainer,
and then remove the secondary PCIe riser cage.
9.
Remove the full-length expansion board.
To replace the component, reverse the removal procedure.
Heatsink
Summary of Contents for ProLiant DL385p
Page 12: ...Customer self repair 12 ...
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...
Page 50: ...Removal and replacement procedures 50 o 8 or 16 SFF configuration o 8 LFF configuration ...
Page 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Page 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Page 99: ...Acronyms and abbreviations 99 UID unit identification USB universal serial bus ...