Hardware options installation 53
5.
Route the power cord through the power cord anchor or cable management arm.
6.
Reposition the cable management arm into the operating position.
7.
Connect the power cord to the power source.
8.
Be sure that the power supply LED is green ("
Rear panel LEDs and buttons
" on page
12
).
9.
Verify that the corresponding power supply LED on the SID is green.
Expansion board options
The server supports PCI, PCI-X, and PCI Express expansion boards.
Removing expansion slot covers
CAUTION:
To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCI riser cage.
CAUTION:
For proper cooling do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
1.
Power down the server (on page
22
).
2.
Extend the server from the rack (on page
22
).
3.
Remove the access panel (on page
23
).
4.
Remove the PCI riser cage (on page
26
).
5.
Remove the expansion slot cover:
o
To remove slot cover 1 or 4, push in on the retainer to release it, and then slide out the cover.
Summary of Contents for ProLiant DL380 G6 Server
Page 63: ...Cabling 63 Cabling SAS hard drive cabling Optical drive cabling ...
Page 64: ...Cabling 64 BBWC battery cabling ...
Page 85: ...Troubleshooting 85 ...
Page 110: ...Technical support 110 ...
Page 111: ...Technical support 111 ...