Setup 32
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the rack.
Install the heaviest item first, and continue to populate the rack from the bottom to the top.
1.
Install the server and cable management arm into the rack. For more information, see the installation
instructions that ship with the 2U Quick Deploy Rail System.
2.
Connect peripheral devices to the server.For connector identification information, see Rear panel
components (on page
11
) in this guide.
WARNING:
To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
3.
Connect the power cord to the rear of the server.
4.
Install power cord anchors.
5.
Secure cables to the cable management arm.
IMPORTANT:
When using cable management arm components, be sure to leave enough slack
in each of the cables to prevent damage to the cables when the server is extended from the rack.
Summary of Contents for ProLiant DL380 G6 Server
Page 63: ...Cabling 63 Cabling SAS hard drive cabling Optical drive cabling ...
Page 64: ...Cabling 64 BBWC battery cabling ...
Page 85: ...Troubleshooting 85 ...
Page 110: ...Technical support 110 ...
Page 111: ...Technical support 111 ...