Installing an HPE Smart Array P816i-a SR Gen10 Controller option
Installing an HPE Smart Array P816i-a SR Gen10 Controller option
Prerequisites
Prerequisites
Before installing this option, be sure that you have the following:
The components included with the hardware option kit
Additional cables, as required. For more information, see Cabling
T-15 Torx screwdriver
Procedure
Procedure
1. Observe the following alerts:
WARNING:
WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
CAUTION: To prevent damage to electrical components, properly ground the server before beginning any
installation procedure. Improper grounding can cause electrostatic discharge.
2. Back up all server data.
4. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
5. Do one of the following:
a. Extend the server from the rack .
b. Remove the server from the rack .
7. Install the controller.
8. Connect the cables.
The following illustration shows the 8+2 SFF backplane configuration connected to the controller. Additional cabling options are
available.
Installing an HPE Smart Array P816i-a SR Gen10 Controller option
116
Summary of Contents for HPE ProLiant DL365 Gen10 Plus Server
Page 7: ...10 5 Regulatory information 10 6 Documentation feedback ...
Page 8: ...Component identification Component identification 8 ...
Page 24: ...Device numbers 8 SFF device bay numbering 8 SFF 2 SFF device bay numbering Device numbers 24 ...
Page 25: ...Drives Drives 25 ...
Page 29: ...Fan bay numbering Fan bay numbering 29 ...
Page 30: ...Operations Operations 30 ...
Page 45: ...Setup Setup 45 ...
Page 62: ...Hardware options installation Hardware options installation 62 ...
Page 78: ...Installing an 8 SFF optical drive 78 ...
Page 79: ...Universal media bay options Universal media bay options 79 ...
Page 97: ...Secondary PCI riser options Secondary PCI riser options 97 ...
Page 104: ...Full length Installing an expansion board in the secondary riser cage 104 ...
Page 118: ...Installing an HPE Smart Array P816i a SR Gen10 Controller option 118 ...
Page 119: ...Processor and heatsink options Processor and heatsink options 119 ...
Page 147: ...Installing the Trusted Platform Module board Installing the Trusted Platform Module board 147 ...
Page 156: ...Software and configuration utilities Software and configuration utilities 156 ...
Page 185: ...Keeping the system current Keeping the system current 185 ...
Page 198: ...Troubleshooting Troubleshooting 198 ...
Page 200: ...Cabling Cabling 200 ...
Page 217: ...Support and other resources Support and other resources 217 ...