Figure
2-1.
HP
85108
Pulsed-RF
Netw
ork
Analyzer
System
Site
Preparation
Site
preparation
includes
the
en
vironmen
tal
and
electrical
requiremen
ts
necessary
for
the
HP
85108
system
to
op erate
within
its
sp ecications.
Make
sure
y
our
site
meets
these
requiremen
ts
b efore
installing
the
system.
Environmental
Requirements
The
en
vironmen
tal
requiremen
ts
of
the
HP
85108
system
are
listed
in
T
able
2-3 .
Notice
that
these
c
haracteristics
are
the
same
as
those
for
the
HP
8510C
net
w
ork
analyzer.
T
able
2-3.
HP
85108
Environmental
Requirements
T
emp erature
+5
C
to
40
C
(+41
F
to
104
F)
Relative
Humidity
5%
to
95%
at
+40
C
or
less
(non-condensing)
Altitude
Up
to
4600
meters
(appro
ximately
15,000
feet)
System
Installation
2-3
Summary of Contents for 85108
Page 4: ......
Page 9: ...C Loading the System Con guration Disk Introduction C 1 Procedure C 1 Index Contents 5 ...
Page 18: ......
Page 32: ...Figure 2 3 HP 85108 System Cabling Diagram rack mounted system 2 14 System Installation ...
Page 84: ......
Page 85: ......
Page 86: ......
Page 92: ......
Page 106: ...Figure 6 5 HP 85102 Pulsed RF Signal Path 6 14 System Service and Troubleshooting ...
Page 112: ...6 20 System Service and Troubleshooting ...
Page 113: ...Figure 6 7 HP 85108A Block Diagram ...
Page 114: ......
Page 116: ......
Page 118: ...Figure 7 1 HP 85108 Replaceable Parts 7 2 Replaceable Parts ...
Page 121: ...Figure 7 2 HP 85108 Replaceable Parts Replaceable Parts 7 5 ...
Page 125: ...Figure A 1 Pulse Terms and Definitions Glossary of Pulsed RF System Terms A 3 ...
Page 126: ......
Page 132: ......
Page 136: ......