18
Installation
,QVWDOOLQJWKH*&
Installing the GC
Materials needed:
Column cutter (5181-8836)
Flat-blade screwdriver
Wrenches, 7/16 inch, open-ended (2 needed) (8710-0806
Please refer to the GC/MS application note,
Optimizing splitless injections on
your GC for high-performance MS analysis
before installing the GC.
1
9HULI\WKHHOHFWULFDORXWOHWLVVXLWDEOHIRUWKH*&DQGWKDWWKHOLQHYROWDJH
LVFRUUHFW
2
8QSDFNWKH*&DQGSODFHLWRQWKHEHQFK
This job requires assistance from another person. Do not take the Swagelok fittings
off the EPC ports until the carrier gas supply is ready to be connected to the GC.
The system was sealed containing helium gas to prevent contamination by air.
3
&RQQHFWWKHIRRWFRSSHUWXELQJRUDFXVWRPOHQJWKWRWKHFDUULHUJDV
VXSSO\OLQH
Copper supply tubing
Main supply on/off valve
Carrier gas supply
Two-stage regulator
On/off valve
Three-stage trap
Copper supply tubing
Summary of Contents for 5973
Page 1: ...H Hardware Installation Manual HP 5973 Mass Selective Detector ...
Page 4: ...4 ...
Page 14: ...14 ...
Page 34: ...34 ...
Page 35: ...3 Checklists Installation checklist 36 Customer familiarization checklist 40 ...
Page 44: ...44 ...
Page 46: ...H Manual Part Number G1099 90006 Copyright 1998 Hewlett Packard Printed in USA 1 98 ...