2
Installation
Inspecting the shipped materials, 17
Installing the GC, 18
Installing the MSD, 22
Plumbing the methane line to the CI MSD flow module, 26
Installing the MSD ChemStation, 28
Integrating the GC, MSD, and ChemStation, 29
Verifying EI system performance, 30
Switching from EI to CI operating mode, 31
Verifying CI performance, 32
Familiarizing the customer, 33
Summary of Contents for 5973
Page 1: ...H Hardware Installation Manual HP 5973 Mass Selective Detector ...
Page 4: ...4 ...
Page 14: ...14 ...
Page 34: ...34 ...
Page 35: ...3 Checklists Installation checklist 36 Customer familiarization checklist 40 ...
Page 44: ...44 ...
Page 46: ...H Manual Part Number G1099 90006 Copyright 1998 Hewlett Packard Printed in USA 1 98 ...