8
General Information
&XVWRPHUUHVSRQVLELOLWLHV
Customer responsibilities
The following are not included in the standard installation. They are the
responsibility of the customer unless previous arrangements have been made
between the customer and the Hewlett-Packard Customer Service Organization.
•
Preparation of all site facilities including the provision of adequate space,
supporting bench, and ac power to match the unit purchased
•
Operating supplies: high-purity carrier gas, syringes, vials, and solvents
•
Required
high-purity methane reagent gas for PCI/NCI MSD
•
Optional other reagent gas(es) for CI MSD
•
Additional methane/isobutane gas purifier if isobutane will we used.
•
Hose for venting pump exhaust outside or to a fume hood, if toxic chemicals will
be analyzed or if dangerous carrier or CI reagent gases will be used.
•
Installation and testing of additional detectors on the HP 6890 Series GC
•
Training for programs not specifically listed in this document
•
Tests of customer-supplied samples or equipment
•
Any tasks not described in this manual
In addition, the customer is required to:
•
Provide someone to help lift the GC onto the bench
•
Have a user present during installation and familiarization
Summary of Contents for 5973
Page 1: ...H Hardware Installation Manual HP 5973 Mass Selective Detector ...
Page 4: ...4 ...
Page 14: ...14 ...
Page 34: ...34 ...
Page 35: ...3 Checklists Installation checklist 36 Customer familiarization checklist 40 ...
Page 44: ...44 ...
Page 46: ...H Manual Part Number G1099 90006 Copyright 1998 Hewlett Packard Printed in USA 1 98 ...