Checklists
,QVWDOODWLRQFKHFNOLVW
39
o
Performance verification
o
Tune performance verified
o
Sensitivity performance verified
o
Switch CI MSD to CI operating mode
o
MSD vented
o
EI ion source removed
o
CI ion source installed
o
CI interface tip seal installed
o
MSD pumped down and baked out for 2 hours
o
Software set up for CI operation
o
Methane reagent gas flow set up
o
Acceptable air and water background verified
o
CI performance verification
o
PCI autotune performed
o
PCI sensitivity verified
o
NCI autotune performed
o
NCI sensitivity verified
o
Instrument log book entries completed
o
Signal-to-noise results faxed or mailed to the factory
HP 5973 MSD serial number
EI S/N (rms)
PCI S/N (rms)
NCI S/N (rms)
Summary of Contents for 5973
Page 1: ...H Hardware Installation Manual HP 5973 Mass Selective Detector ...
Page 4: ...4 ...
Page 14: ...14 ...
Page 34: ...34 ...
Page 35: ...3 Checklists Installation checklist 36 Customer familiarization checklist 40 ...
Page 44: ...44 ...
Page 46: ...H Manual Part Number G1099 90006 Copyright 1998 Hewlett Packard Printed in USA 1 98 ...