100
Field Description
Calculation trigger type
Route calculation trigger type:
•
Full
—Calculation of all routes is triggered.
•
Area topology change
—Topology change in an area.
•
Intra router change
—Incremental intra-area route change.
•
ASBR change
—Incremental ASBR route change.
•
7to5 translator
—Type-7-to-Type-5 LSA translator role
change.
•
Full IP prefix
—Calculation of all IP prefixes is triggered.
•
Full intra AS
—Calculation of all intra-AS prefixes is
triggered.
•
Inc intra AS
—Calculation of incremental intra-AS prefixes is
triggered.
•
Full inter AS
—Calculation of all AS-external prefixes is
triggered.
•
Inc inter AS
—Calculation of incremental AS-external
prefixes is triggered.
•
N/A
—Route calculation is not triggered.
Current calculation type
Current route calculation type:
•
SPF calculation.
•
Intra router calculation
—Intra-area route calculation.
•
ASBR calculation
—Inter-area ASBR route calculation.
•
Inc intra router
—Incremental intra-area route calculation.
•
Inc ASBR calculation
—Incremental inter-area ASBR route
calculation.
•
7to5 translator
—Type-7-to-Type-5 LSA calculation.
•
Full intra AS
—Calculation of all intra-AS prefixes.
•
Inc intra AS
—Calculation of incremental intra-AS prefixes.
•
Full inter AS
—Calculation of all AS-external prefixes.
•
Inc inter AS
—Calculation of incremental AS-external
prefixes.
•
Forward address
—Forwarding address calculation.
•
N/A
—Route calculation is not triggered.
Current calculation phase
Current route calculation phase:
•
Calculation area topology
—Calculating area topology.
•
Calculation router
—Calculating routes on routers.
•
Calculation intra AS
—Calculating intra-AS routes.
•
7to5 translator
—Calculating Type-7-to-Type-5 LSAs.
•
Forward address
—Calculating forwarding addresses.
•
Calculation inter AS
—Calculating AS-external routes.
•
Calculation end
—Ending phase of calculation.
•
N/A
—Route calculation is not triggered.
Process reset state
Process reset state:
•
N/A
—The process is not reset.
•
Under reset
—The process is in the reset progress.
•
Under RIB smooth
—The process is synchronizing the RIB.