¾
Swing out the filling auger and position the
filling tube above the hopper opening.
¾
Turn the filling funnel to the working position
and lower the funnel to the ground.
¾
Turn the three-way valve over to
worm gear
.
sw 12000 sd
gebläse - schnecke
ed
00380882
Entw.
Dateiname
Maschine
Zeichnung
JJKW
Zeichnungsnummer
00380882
Three-way valve
¾
Switch on the fan drive control unit and run
the tractor engine with medium speed.
¾
Operate the control unit and run the auger.
The control unit can be operated from the
ground or from the hopper. Observe the cor-
rect direction of rotation.
¾
Fill seed or fertiliser in the funnel until the
hopper is full.
¾
Allow funnel and auger to run empty.
¾
Briefly let the worm gear run in the opposite
direction and then switch it off.
¾
Switch off the fan drive on the tractor and turn
over the three-way valve to
fan drive
.
¾
Place a collecting container in position and
swing the funnel to transport position.
¾
Collect the residue in the tank and allow the
tube to drain.
¾
Swivel the auger to the transport position.
Hook in and secure tube lock and swivel lock.
¾
Fold in and secure the auger before road
travel.
WARNING
Danger of severe injury caused by the unfolding
auger.
¾
Always fold in and secure the auger before
road travel.
64
65