![Honda HondaJet HA-420 Pilots Operating Manual Download Page 223](http://html1.mh-extra.com/html/honda/hondajet-ha-420/hondajet-ha-420_pilots-operating-manual_2158199223.webp)
Honda Aircraft Company
HA-420
SYSTEMS
POM
DESCRIPTION
HJ1-29000-005-001
October 30, 2016
1-207
System Tests Pages
A System Tests page is available on the Aircraft Systems page or
through the Initialization page. This page allows activation of several
pilot initiated tests.
A Preflight Test button commands the system to run all the tests in a
sequential manner. During test execution, status is shown as In Progress
on the respective button as well as in the Test Status box at the top right
corner of the page.
At completion, the button for each test indicates result of the test. Tests
that require a pilot evaluated condition (Fire Detection Illumination, Stall
Protection, and Switch Illumination) indicate “Done” when the test
sequence has run to completion and all associated automated steps
passed.
If any automated steps fail, “Fail” will be indicated. If the test does not
require any pilot evaluation (Optional CVFDR Test), “Pass” or “Fail”
will be indicated at the completion of the test.
NOTE
The Test Status box will also indicate execution of
automatic system initiated tests. Pilot initiated tests cannot
be executed when a system initiated test is already running.
The available tests are:
-
Fire Detection
-
Stall Protection
-
Switch Illumination
-
CVFDR (optional, if CVFDR is installed). This test is not
included in the automated Preflight sequence.
FOR TRAINING PURPOSES ONLY