1.6
Times taken for repair
Adjustment and tuning
Time
Blade engagement
4 min
Drive engagement and brake (Mechanical drive models)
4 min
Transmission chain tension
3 min
Making the cutting deck parallel
by means of ropes
2 min
complete adjustment after removal
8 min
Steering allowance adjustment
5 min
Checking blade alignment
4 min
Blade sharpening and balancing
10 min
Brake adjustment (Hydrostatic drive models)
(1)
4 min
Drive belt adjustment (Hydrostatic drive models)
2 min
Pedal adjustment (Hydrostatic drive models)
4 min
Disassembly of main units (without reassembly)
Disassembly of front fairing
2 min
Disassembly of wheel cover
8 min
Disassembly of rear conveyor
2 min
Disassembly of rear plate
4 min
Disassembly of control panel
5 min
Disassembly of fuel tank*
2 min
Disassembly of engine
12 min
Disassembly of cutting plate
13 min
Dismantling of pump (Hydrostatic drive models)
22 min
Repairs and/or parts replacements
Replacement of tyres and wheels (each)
2 min
Replacement of front wheel bearings (each)
2 min
Replacement of steering pinion and gear
8 min
Replacement of drive belt
8 min
Replacement of blade drive belt
5 min
Replacement of cutting plate belt
5 min
Disassembly of rear axle
Complete axle (chain)
5 min
Bearings
+ 3 min
Ring gear
+ 4 min
Reassembly
Chain, bearings and axle
12 min
Ring gear
+ 4 min
Replacement of lifting ropes
7 min
Replacement of the blade engagement cable
2 min
Replacement of throttle cable
4 min
Replacement of blade bearings and
shafts
Removal of the plate
5 min
Removal and reassembly of the flange
(each)
4 min
Replacement of the bearings (each)
6 min
Reassembly of the plate
8 min
Dismantling of screw coupling
2 min
(1)
+ Time for removing tank.
(2)
+ Time for the removal of the dash-board (if required).
32