![Homa Saniquick UF100 Original Instruction Manual Download Page 28](http://html1.mh-extra.com/html/homa/saniquick-uf100/saniquick-uf100_original-instruction-manual_2147785028.webp)
28 | ENGLISH
Sewer backflow level
Installation of the chamber extension, if required
1. Lift the installation frame with cover plate and floor drain off the collection tank and pull out the compensation piece.
2. Insert the shaft extension (commercially available KG pipe DN400 with socket and profile seal, maximum length
500mm) into the collection tank until the required height is reached. Make sure that the connections of the inlets and
the connection of the ventilation remain free.
3. Then insert the compensation piece into the socket of the shaft extension again. Place the cover plate with floor drain
back onto the compensation frame.
Installation of wall collar, if required
1. Lift the installation frame with cover plate and floor drain off the collection tank and pull out the compensation piece.
2. Slide the wall collar and the clamps over the compensation piece. Make sure that the surfaces of the compensating
piece and the wall collar are clean.
3. Fix the wall collar in the desired position by tightening the screw on the two clamps.
4. Then place the compensation piece back onto the collection tank. Place the installation frame, cover plate with floor
drain back on the compensation piece.
Installing the cover plate and the mounting frame if you have disassembled it or need to replace it
First, push the profile seal
(item 8)
onto the container all the way to the ledge, and then spread a commercial sanitary lu-
bricant on it from the outside. Now slide the installation frame
(item 1)
on the profile seal
(item 8)
and place the seal
(item
6)
into the mounting frame. The cover
(item 2)
that is to be inserted now can be mounted on both sides. The recessed side
allows for tiling, so that only the grate
(item 7)
can be seen in the floor. After installing the cover, insert the seal
(item 5)
,
the odor trap
(item 3)
, the float
(Item 4)
and the grate
(item 7)
.
No.
Description
A
Air vent
B
Cable inlet
C
Pressure pipe
D
Connection system
E
Sand bedding (on-site)
F
Pump
No.
Description
G
Tiles glued (on site)
H
Thin bed sealing (accessories)
I
Screed (on-site)
J
Insulation (on-site)
K
Concrete base plate (on-site)
L
Wall collar (accessories)