A trial run or functional test of the machine must only 
be carried out in compliance with general operating 
conditions!

For general maintenance, inspection and repair 

work, the recirculation pump must be disconnected 

from all circuits and secured against or blocked from 

accidental start-up again. 

We remind you that we are not liable for any damag-

es caused by our machines due to improper repair 

attempts which were not performed by the manufac-

turer or an authorized service centre, or due to a part 

exchange carried out without original replacement 

parts. The same provisions apply to accessories.

Do not begin work until all rotating parts are still! 

Clean recirculation pump and attached accessories 

thoroughly with clean water before beginning work.

When releasing the oil control screw, excess pres-

sure can be released from the oil chamber and trans-

mission. Only completely unscrew screws once the 

pressure equalisation has taken place. 

Unless stated otherwise, the torque values in the ta-

bles should be used. Values for clean, lubricated 

screws.

Tightening torque [Nm] for A2/A4 screws (friction coeffi-
cient = 0.2)

A2/A4,
Strength 70

A2/A4,
strength 80

DIN912/DIN933

DIN912/DIN933

M6

7 Nm

11.8 Nm

M8

17 Nm

28.7 Nm

M10

33 Nm

58 Nm

M12

57 Nm

100 Nm

M16

140 Nm

245 Nm

M20

273 Nm

494 Nm

6.2. Maintenance

It is imperative to carry out a maintenance schedule in 
order to keep informed about the status of the recircu-
lation pump. This list must be presented to the trade 
association, the technical inspection agencies and the 
manufacturer of the system or the stirrer on request. The 
full warranty claim requires the annual review of the recir-
culation pump by the manufacturer of the system or the 
recirculation pump.

6.2.1. General (Monthly or per every 500 hours of 

operation) 

Keep the recirculation pump clean (otherwise cooling is 
affected). Coiled foreign bodies must be removed from 
the recirculation pump. The connection cable must be 
examined for abrasions, drag marks, buckling and other 
damage. If the cable is defective, there is a danger that 
the agitation medium enters the agitator and can cause 
damage. 

A defective cable must be replaced immediately by the 
manufacturer or an authorised workshop. 

The recircu-

lation pump must be checked for damage to the anti-cor-
rosive coating and leaks.

6.2.2. Electric motor 

The power consumption must be checked monthly during 
all 3 phases. Damage to the engine, transmission and 
storage can be detected from the current consumption.

Lubrication:

 The bearings are lubricated for life (if noise 

develops, bearings must be replaced at the manufactur-
er’s plant). The oil of the oil chamber should be changed 
after each 6000 hours of operation.

Insulation test:

 If the insulation resistance is less than 2 

megaohms, the submersible mixer cannot be switched 
on. (Measuring DC voltage 1500 V) 

6.2.3. Stirring propeller 

Checks: Check the stirring propeller periodically. Remove 
coiled foreign bodies such as twines and cords. They can 
lead to irregular movement and thus to strong vibrations 
of the system and damage to components of the agitator. 
Remember to clean the propeller stirrer in case of highly 
uneven movement.

6.3. Oil change

The oil chamber of the recirculation pump is filled 

with lubricating oil at the factory. An oil change is 

only required in case of damage. Inform your autho-

rised workshop.

Summary of Contents for HRZ

Page 1: ...Original Betriebsanleitung EN Original Instruction Manual NL Originele handleiding HRZ...

Page 2: ...rdermedien 06 3 Allgemeine Beschreibung 07 3 1 Verwendung 07 3 2 Einsatzarten 07 3 3 Aufbau 07 4 Verpackung Transport und Lagerung 09 4 1 Anlieferung 09 4 2 Transport 09 4 3 Lagerung 09 4 4 R ckliefe...

Page 3: ...ur Unfallverh tung Diese Betriebsanleitung muss dem Bedienpersonal jederzeit am Einsatzort des Produk tes verf gbar sein 1 3 Bestimmungsgem e Verwendung Die HOMA Produkte entsprechen den g ltigen Sich...

Page 4: ...m ig durchzuf hren und d rfen nur von qualifi zierten und autorisierten Personen durchgef hrt werden Wartungsarbeiten und jegliche Art von Reparaturarbeiten die nicht in dieser Betriebsanleitung aufge...

Page 5: ...auftretende St rung oder Un regelm igkeit sofort seinem Verantwortlichen zu melden Eine sofortige Stillsetzung durch den Bediener ist zwingend erforderlich wenn M ngel auftreten wel che die Sicherheit...

Page 6: ...stoffe k nnen sich an diesen Teilen sehr scharfe Kanten bilden Warnung vor drehenden Teilen Die drehenden Teile k nnen Gliedma en quetschen und abschneiden W hrend des Betriebes nie in das R hrwerk od...

Page 7: ...m Volumenstrom bei kleiner F rderh he bis max 1 5 Trockensubstanzgehalt Einsatzgebiete sind unter anderem das F rdern von Belebtschlamm aus Nitrifikation in Denitrifikation Naturbadeteiche Wasserbahne...

Page 8: ...tung Zwei Radialwellendich tringe au en Siliziumkarbid Siliziumkarbid innen Lagerung zwei Kegelrollenlager 3 3 4 berwachungseinrichtungen Das Aggregat ist mit verschiedenen berwachungs Si cherheitsein...

Page 9: ...bkni cken Besch digungen und Feuchtigkeitseintritt zu sch tzen Gefahr durch elektrischen Strom Durch besch digte Stromzuf hrungsleitungen droht Lebensgefahr Defekte Leitungen m ssen sofort vom qualifi...

Page 10: ...Es besteht Lebensgefahr Treffen Sie alle Sicherheitsvorkehrungen um dies zu verhindern Installation des F hrungsrohres Die Druckleitung sowie der erforderliche Flansch DIN 2631 PN6 ist bauseits vor d...

Page 11: ...un gen sowie beim Anschluss des Motors sind die entspre chenden rtlichen und VDE Vorschriften einzuhalten Der Motor muss durch einen Motorschutzschalter gesch tzt werden Lassen Sie den Motor gem dem S...

Page 12: ...dingun gen Bei aggressiven und oder abrasiven F rdermedien muss R cksprache mit dem Hersteller gehalten werden da sich in diesen F llen der Zeitraum verk rzen kann Folgende Punkte sind zu beachten Die...

Page 13: ...n Diese Liste ist der Berufsgenossen schaft den Technischen berwachungsvereinen sowie dem Hersteller der Anlage bzw des R hrwerkes auf Ver langen vorzuzeigen Der volle Garantieanspruch setzt die j hrl...

Page 14: ...einem festen Untergrund vertikal abstellen und gegen Umfallen sichern Bei Pumpen muss der Druck und Sauganschluss mit geeigneten Hilfsmitteln z B Folie verschlossen wer den Die elektrische Anschlussl...

Page 15: ...seinrichtungen sind dann mit dem Lastkabel ausgef hrt Aderbezeichnung Motor berwachungseinrichtung berwachungen in der Wicklung T1 T2 Temperaturbegrenzer 2 Schalter in Reihe T1 T3 Temperaturregler 2 S...

Page 16: ...neral description 21 3 1 Use 21 3 2 Types of use 21 3 3 Design 21 4 Package Transport Storage 23 4 1 Delivery 23 4 2 Transport 23 4 3 Storage 23 4 4 Returning to the supplier 23 5 Installation and com...

Page 17: ...ual must also be accessible to personnel at all times and also be made available where the product is used 1 3 Proper use The HOMA products comply with the valid safety regu lations and meet the deman...

Page 18: ...he product and or injure personnel 1 5 3 Maintenance The prescribed maintenance and inspection work should be carried out regularly This work may only be carried out by qualified trained and authorize...

Page 19: ...d or control devices Damage to critical parts Damage to electric installations cables and in sulation Tools and other objects should be kept in a place re served for them so that they can be found qui...

Page 20: ...fety and control devices Our products are equipped with various safety and con trol devices These include for example suction strainers thermo sensors sealed room monitor etc These devices must never...

Page 21: ...y Sn Type Prop F mm N Tmax C min 1 kg min 1 Motor kW Ins cl Hz A U U V P2 V kW Cos I A I P1 Made in Germany Do not open when non intrinsically safe circuits are energized 3 m 3 2 4 5 6 7 8 13 14 15 16...

Page 22: ...onnection the correct rotation direction of the propeller must be checked The propeller must rotate clockwise as seen from the motor If the rotation direction of the stirring propeller is incorrect tr...

Page 23: ...ore storage to prevent impurities The power supply cables should be protected against kinking damage and moisture Beware of electrical current Damaged power supply cables can cause fatal inju ry Defec...

Page 24: ...otwear may cause a fall Danger of death Follow all safety pre cautions in order to prevent this Installation of the guide tube The discharge line and the required flange DIN 2631 PN6 should be install...

Page 25: ...damaged Check the operating voltage and ensure a a uniform cur rent consumption during all phases in accordance with the machine data sheet Make sure that all temperature sen sors and monitoring devi...

Page 26: ...enance inspection and cleaning work on the machine and the system must be carried out with the greatest care by trained specialist personnel in a safe workplace The necessary personal protective equip...

Page 27: ...rer on request The full warranty claim requires the annual review of the recir culation pump by the manufacturer of the system or the recirculation pump 6 2 1 General Monthly or per every 500 hours of...

Page 28: ...inst frost Place it down vertically onto a firm foundation and secure it against falling Seal the intake and discharge ports of pumps with suitable material such as foil Support the electric connectin...

Page 29: ...ng devices are run from the power cable Cable identification Motor Monitoring system Monitoring in winding T1 T2 Temperature limiter 2 switches in series T1 T4 Temperature controller 2 switches in ser...

Page 30: ...emene beschrijving 35 3 1 Toepassing 35 3 2 Toepassingswijzen 35 3 3 Opbouw 35 4 Verpakking transport en opslag 37 4 1 Aanlevering 37 4 2 Transport 37 4 3 Opslag 37 4 4 Retourneren 38 5 Opstelling en...

Page 31: ...dt deze uit Deze handleiding moet altijd beschikbaar zijn voor het bedie ningspersoneel op de werkplek van het product 1 3 Beoogd gebruik De HOMA producten voldoen aan de geldende veilig heidsregels e...

Page 32: ...nsti ge schade aan het product en of tot ernstig letsel 1 5 3 Onderhoud De voorgeschreven onderhouds en inspectiewerkzaam heden moeten regelmatig worden uitgevoerd en mogen uitsluitend door gekwalific...

Page 33: ...g onmiddel lijk melden aan zijn leidinggevende Een onmiddellijke stilzetting door de bediener is dwin gend noodzakelijk wanneer er gebreken optreden die de veiligheid in gevaar brengen Hieronder valle...

Page 34: ...erantwoordelijk voor de nale ving van de voorschriften Tijdens het bedrijf draaien bepaalde onderdelen waaier propeller om de vloeistof te verpompen Door bepaalde bestanddelen kunnen er aan deze onder...

Page 35: ...eze vloeistoffen 3 Algemene beschrijving 3 1 Toepassing De recirculatiepompen zijn geschikt voor pomptoepassin gen met grote volumestroom bij kleine opvoerhoogte tot max 1 5 drogestofgehalte Toepassin...

Page 36: ...oefkogellagers 3 3 3 Overbrenging Algemene overbrengingsgegevens Type Planeetaandrijving Tandwielen gehard en geslepen Beschermingsklasse IP68 Asafdichting glijringafdichting Twee keerringen buiten Si...

Page 37: ...en schade bij transport en opslag uit Bij een regelmatige wisseling van locatie dient u de verpakking zorgvuldig te bewaren voor hergebruik 4 3 Opslag Nieuw geleverde producten zijn dusdanig behandeld...

Page 38: ...dat de elastomere delen en de coatings onderhevig zijn aan een natuurlijke verbrossing Wij adviseren deze bij een opslag van meer dan 6 maan den te controleren en indien nodig te vervangen Overleg hi...

Page 39: ...stigd dat deze niet in de propeller terecht kan ko men en niet onder spanning staat Na het laten zak ken van de recirculatiepomp moet de ketting of de staalkabel worden ontlast Aanleggen van de motora...

Page 40: ...aleven van de EMC richtlijnen Het informatieblad Toepassing van HOMA pompen op een frequentieomvormer moet in acht worden genomen 5 7 Inschakelwijzen Inschakelwijzen bij kabels met vrije uiteinden zon...

Page 41: ...de gereedschap en materi aal beschikbaar is Orde en reinheid garanderen veilig en probleemloos werken aan de machine Verwijder na de werkzaamheden gebruikt poetsmateriaal en gereedschap van de machine...

Page 42: ...t stroomnet Bij een tij delijke buitenbedrijfstelling moet de pomp compleet onder gedompeld blijven zodat deze beschermd is tegen vorst en ijs Er moet worden gegarandeerd dat de bedrijfsruimte en de v...

Page 43: ...n dan met de hijskabel uitgevoerd Aderaanduiding motor Bewakingscontrole Bewakingen in de wikkeling T1 T2 Temperatuurbegrenzer 2 schakelaars in serie T1 T4 Temperatuurregelaar 2 schakelaars in serie T...

Page 44: ...edingte Kontaminierung des Ger tes toxisch nein ja welche Stoffe tzend nein ja welche Stoffe mikrobiologisch nein ja welche Stoffe explosiv nein ja welche Stoffe radioaktiv nein ja welche Stoffe sonst...

Page 45: ...the instruments toxic no yes substance corrosive no yes substance microbiological no yes substance explosive no yes substance radioactive no yes substance other substances no yes substance Legally bi...

Page 46: ...tourneren Contaminatie van het apparaat als gevolg van de toepassing giftig nee ja welke stoffen bijtend nee ja welke stoffen microbiologisch nee ja welke stoffen explosief nee ja welke stoffen radioa...

Page 47: ...47...

Page 48: ...x 49 0 2247 702 44 e Mail info homa pumpen de Internet www homa pumpen de Industriestra e 1 53819 Neunkirchen Seelscheid Telefon 49 0 2247 702 0 Fax 49 0 2247 702 44 e Mail info homa pumpen de Interne...

Reviews: