Step 3 – Installation of Boom
Slide (2) Horizontal/Vertical
Fin Mounts onto the boom.
This installation will be
finalized later in the
assembly process.
Install the (2) Boom Halves
into the frames using (4)
M3-35 Cap head Bolts & (4)
M3 Lock nut only loosely
attach the nuts and bolts.
With the belt straight and
the Tail rotor Assembly
pointed up insert the boom
into the boom halves and
put the belt over the Front
Pulley Gear and pull boom
tight to apply tension to the
belt