b. Line-drop current transformers
The three line-drop current transformers
(9),
in conjunction with burden resistors
(8),
detect
the magnitude and power factor of current flowing from generator to load. They feed a signal
to the voltage regulator which interprets the signal and alters the exciter field current as
required to maintain a constant predetermined voltage at the load
(see Voltage Regulator
Manual No. TM-232).
c. Overload current transformers
Three overload current transformers
(3),
in conjunction with burden resistors
(1),
monitor the
output load current in each of the three output phases, and supply a reduced value current
signal to the overload module
(7).
(3)
Overload module
The overload module
(7)
is a solid-state device designed to interpret a signal from transformers
(3)
and to send a signal to the protective monitor module
(4, Fig. 8)
when an overload condition
exists in any generator output phase. A pull-apart electrical connector is mounted on the
overload module to provide quick-disconnect facilities for all wiring to the module. The overload
module is equipped with a hermeticallysealed, reed-type relay. Relay contacts are normally
open. The solidstate circuitry is designed to close relay contacts when output current in ANY
phase reaches 125% of normal rated output capacity. The closed relay sends a signal to the
protective monitor. This signal “gates” the overload SCR
(silicone-controlled rectifier)
in the
protective monitor and interrupts the load contactor holding circuit, allowing the load contactor to
open.
The following is a list of overload module characteristics:
NOTE: The overload protective system will function when any phase carries 123% to 127% of rated
load.
•
At 125% load the module will function in 4 minutes.
•
At 150% load the module will function in 16 seconds.
•
At 200% load the module will function in 4 seconds.
NOTE:
All times are plus or minus 25% and are nonadjustable.
(4)
Rectifier
A diode-bridge rectifier
(5)
receives 400-Hz AC from phase C of the generator output an
converts it to a pulsating, direct current for energization of the load contactor holding coil only.
This DC coil-holding circuit is controlled indirectly be controlling the 400-Hz AC to the rectifier.
The ground circuit for the rectifier’s AC supply must pass through the relay contacts in the
protective monitor module to ground cable N. Therefore, any time a protective device functions
to open the protective monitor relay, the rectifier’s AC circuit is opened. No DC is then available
for the load contactor holding coil, hence, the load contactor opens.
(5)
Terminal boards
Three terminal boards
(2)
provide connection facilities for small leads.
OM-499
May 31/94 Revised
1-1
Page 21
Summary of Contents for 6824-1
Page 2: ...This page intentionally left blank...
Page 6: ...This page intentionally left blank OM 499 Safety Warnings May 31 94 Revised Page 4...
Page 8: ...This page intentionally left blank OM 499 Introduction May 31 94 Revised Page 2...
Page 14: ...This page intentionally left blank OM 499 Table of Contents May 31 94 Revised Page 6...
Page 40: ...This page intentionally left blank OM 499 1 1 May 31 94 Revised Page 26...
Page 66: ...Engine Control Panel in Tilt out Position Figure 8 OM 499 2 1 May 31 94 Revised Page 12...
Page 90: ...No 2 Output on Dual Output Units Figure 13 OM 499 2 3 May 31 94 Revised Page 20...
Page 98: ...This page intentionally left blank OM 499 3 1 May 31 94 Revised Page 8...
Page 114: ...This page intentionally left blank OM 499 3 1 May 31 94 Revised Page 24...
Page 122: ...Generator Set Figure 1 OM 499 4 3 May 31 94 Revised Page 2...
Page 124: ...Canopy Assembly Figure 2 OM 499 4 3 May 31 94 Revised Page 4...
Page 126: ...This page intentionally left blank OM 499 4 3 May 31 94 Revised Page 6...
Page 128: ...Canopy Assembly Figure 3 OM 499 4 3 May 31 94 Revised Page 8...
Page 130: ...This page intentionally left blank OM 499 4 3 May 31 94 Revised Page 10...
Page 132: ...Generator Set Without Canopy Figure 4 OM 499 4 3 May 31 94 Revised Page 12...
Page 134: ...This page intentionally left blank OM 499 4 3 May 31 94 Revised Page 14...
Page 136: ...Radiator and Cooling System Group Figure 5 OM 499 4 3 May 31 94 Revised Page 16...
Page 138: ...Air Cleaner Assembly Figure 6 OM 499 4 3 May 31 94 Revised Page 18...
Page 142: ...Fuel Lines Assembly Figure 8 OM 499 4 3 May 31 94 Revised Page 22...
Page 144: ...Oil Line Assembly Figure 9 OM 499 4 3 May 31 94 Revised Page 24...
Page 146: ...Fuel Oil Lines Figure 10 OM 499 4 3 May 31 94 Revised Page 26...
Page 148: ...Fuel Oil Lines Figure 11 OM 499 4 3 May 31 94 Revised Page 28...
Page 150: ...Stator Terminal Panel Assembly Figure 12 OM 499 4 3 May 31 94 Revised Page 30...
Page 152: ...Power Module Panel Assembly Figure 13 OM 499 4 3 May 31 94 Revised Page 32...
Page 154: ...This page intentionally left blank OM 499 4 3 May 31 94 Revised Page 34...
Page 156: ...Control Box Assembly Figure 14 OM 499 4 3 May 31 94 Revised Page 36...
Page 158: ...Generator Controls Tray Assembly Figure 15 OM 499 4 3 May 31 94 Revised Page 38...
Page 160: ...This page intentionally left blank OM 499 4 3 May 31 94 Revised Page 40...
Page 162: ...Protective Relays Tray Assembly Figure 16 OM 499 4 3 May 31 94 Revised Page 42...
Page 164: ...This page intentionally left blank OM 499 4 3 May 31 94 Revised Page 44...
Page 166: ...Control Box and Internal Components Group Figure 17 OM 499 4 3 May 31 94 Revised Page 46...
Page 168: ...Engine Control Panel Assembly Figure 18 OM 499 4 3 May 31 94 Revised Page 48...
Page 170: ...This page intentionally left blank OM 499 4 3 May 31 94 Revised Page 50...
Page 172: ...Output Terminal Board Assembly Figure 19 OM 499 4 3 May 31 94 Revised Page 52...
Page 174: ...Generator Group Figure 20 OM 499 4 3 May 31 94 Revised Page 54...
Page 176: ...Mounting Frame and Lifting Yoke Assembly Figure 21 OM 499 4 3 May 31 94 Revised Page 56...
Page 178: ...Auxiliary Frame and Components Group Figure 22 OM 499 4 3 May 31 94 Revised Page 58...
Page 180: ...Electric Governor Assembly OM 499 4 3 May 31 94 Revised Page 60...
Page 182: ...This page intentionally left blank 4 3 March 31 74 Revised Page 21A OM 499...
Page 194: ...This page intentionally left blank OM 499 4 4 May 31 94 Revised Page 12...
Page 196: ...This page intentionally left blank OM 499 5 0 May 31 94 Revised Page 2...
Page 198: ...This page intentionally left blank OM 499 6 0 May 31 94 Revised Page 2...
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 212: ...This page intentionally left blank OM 499 Unusual Service Conditions May 31 94 Revised Page 2...
Page 214: ......